Equipment log for the Gasonics Asher


2009-8-7
Because the tool was turning on spontaneously with no one logged in [e.g. the chamber was found to be glowing brightly with no one having logged in withing 24 hours], the system was logged down. The source of the problem will be isolated on Monday.
2009-3-27
This tool is now working. The O2 setpoint was adjusted upwards so the tool would not give a low flow error and stop operation.
2009-10-26
The magnetron will be replaced tomorrow.
2009-10-14
Tool is down because of misalignment of loading arm with loading stage, e.g. the arm that loads the wafers from the incoming cassette is not properly aligning them when placing them on the stage susceptor for placement into the tool.
2007-8-22
The oxygen ran out on the asher today, but it has been replaced. It now works fine.
2007-3-9
A user reported a problem with the loading stage. One of the backets was loose and caused a jam in the stage. The bracket has been reset and secured. The staff discovered an error during the unload step. Someone had removed their wafer and did not report the problem.
2007-2-22
Several test runs have been made and photoresist was removed successfully on all test runs. If you encounter problems, report them immediately using the pettit request.
2007-2-21
The problem with the Asher has been fixed and it is working perfectly now.
2007-1-29
The recipes have been re-programmed and the Asher is now back in service.
2007-1-26
The plasma detection system has been reset to the correct specifications. Please do not reset the system as this erases the memory and causes a system failure.
2006-5-3
A few adjustments have been made to the system due to a plamsa error. If the plamsa error continues, we will need to replace the magnatron to the system.
2006-5-19
Several users reported a problem with the plasma in the Asher. The system was logged down today due to this problem. It appears that the power supply needs to be changed out. The system is working now, but we advise all users not to run recipes longer than 1 min over the weekend. If the problem continues next week, we will need to swap out the magnetron.
2006-4-5
A user reported a problem with the Asher. The recipes were running at incorrect process times. We discovered that all of the recipes had been wiped from the system. This only occurs when there is a cleanroom wide power outage or if someone turns the machine off and then turns it back off. No users should be turning equipment off and on.
2006-4-19
This is a friendly reminder to all users. No 2 min recipes are allowed on the system. Also no users may shut the system down. If you have a problem please report it immediately.
2006-4-12
The problem with the lamp 3 failure has been resolved. The system is currently down due to a plasma error. We will be running test runs tomorrow morning.
2006-4-11
A user reported that gas channel 1 was out of compliance. The O2 bottle needed to be replaced. It was replaced late this morning.
2006-3-15
Houri Johari has been assigned as the new trainer for the Gasonics Asher. She will now be in charge of the training for this system. Charlie Suh will still be in charge of performing the check-offs on the system.
2006-3-1
A user reported a problem with the Asher attacking the surface of their gold covered substrate. There is a possibility that the plasma is deforming the soft metal. If any other users are experiencing the same problem, please let us know. A few users have inquired about a small sample holder for the Asher. If need a sample holder that will hold samples smaller than a 4" wafer, please email Charlie at cs176@mail.gatech.edu. Please give a brief description of what sized and type of sample you are using, and why you do not want to use cool grease.
2006-11-3
The machine is completely functional once again.
2006-10-3
We are installing a vacuum switch in case a wafer gets improperly seated on the load arm. Please contact Charlie for more information on how to use the vacuum switch.
2005-9-20
The mass flow controllers have been calibrated for this system. The warm up step was put back into operation for the system. We are still conducting test runs on the system to find the cause of the lamp 3 error, but it is still available for use.
2005-9-2
The system has been logged down due to some software issues. We will be performing some maintenance on the system tomorrow morning.
2005-9-2
Several users have reported a problem with gas channel one. The settings for channel one needed to be adjusted. A temporary fix has been put in. We will run a complete mass flow controller calibration on Tuesday.
2005-9-19
The warm up step has been removed from the Asher. We found that this step was causing the lamp error. We will be running test runs on the system tomorrow. The Asher is still available for use.
2005-9-16
A user reported a problem with a lamp 3 error. This seems to be a reoccuring problem. We are in the process of permanently resolving this issue. For now, a temporary fix has been put in place.
2005-8-8
A user reported a problem with recipes in the system. The recipes were reset to their default settings due a problem with the main circuit board. We have put in the correct parameters for recipes A and B.
2005-8-5
We found a short in one of the control boards. This was causing the lamp 3 failure users have been experiencing this week. The system has been logged back up. If there are any more problems with this system, please contact Charlie.
2005-8-3
A cleanroom user reported a problem with the Asher today. A loose sensory wire is the culpret to this intermitten problem. The system is however still available for cleanroom processing.
2005-8-29
This is a reminder that all wafers must be run using the 1 min recipe only. Recipe combination AB is not allowed.
2005-8-25
All users are reminded that the maximum recipe time allowed is 2 mins. All users before the month of March were required to send in an email acknowledging the new policy. All new users are required to know this policy in order to gain access to the equipment.
2005-8-18
The settings for the Asher have been restored. Please report any processing problems on this system to Charlie at cs176@mail.gatech.edu
2005-8-17
A user reported that the warmup step in the Asher. The software problem we had over the weekend with the system caused the settings to go back to default. We will reset all of the settings tomorrow. For now users may use the system without the warm up step.
2005-6-16
A user reported a problem with the Asher early this afternoon. We discovered that a wafer was shattered inside the chamber. We are currently investigating the cause shattered wafer. Please remember to report problems with the system right away. We ran a test wafer in the system, and the system worked fine. It has been logged back up.
2005-5-25
A user reported that the system was not working properly. One of the relays has been replaced. We ran test runs on the system to make sure it works.
2005-4-29
A cleanroom user reported that the asher was not functioning properly when they attempted to clean their wafers. Upon further inspection cleanroom staff found that the system was not in the normal operating mode. The system was put back in the correct operating mode, and is once again ready for cleanroom use.
2005-4-28
A user reported that the stage was not properly moving. We found that one of the motor's fuse had blown. The fuse was replaced and the system once again has a movable stage.
2005-4-1
Earlier today, we discovered that the entire system had crashed. We have re-programmed all of the recipes and system parameters, and the system is operational. However, we are still investigating the cause of the crash. The Asher will be available for use later this afternoon.
2005-3-9
The small sample holder is still missing for the GaSonics Asher. If you know there whereabouts of this holder please contact MiRC staff or just return it to the asher so that other users can utilize it.
2005-3-8
The small sample holder for the asher is still missing. If you have used the sample holder before, please check your toteboxes to see if you have accidentily taken it.
2005-3-3
Asher users: you only have until 12am tonight to reply to Charlie Suh's email. Failure to respond will result in suspension from the GaSonics Asher.
2005-3-29
Etch rate testing will be occuring this Thursday on the GaSonics Asher system.
2005-3-2
An email was sent yesterday by Charlie Suh with instruction regarding the GaSonics Asher. If you do not respond to Charlie's email by tomorrow night your equipment access will be removed.
2005-3-14
Several cleanroom users have reported a problem with a lamp 3 failure error. It turns out that whenver you operate the system without the sample loading cover in place you will receive this error. Please be sure to be properly using this sample cover to prevent this error from occuring.
2005-3-10
The small sample holder has been found, its seems someone placed it on the hallway cart. The small sample holder should reside on top of the asher in the box labeled "small asher sample holder."
2005-3-1
Earlier today an email was sent out by Charlie Suh in regards to the proper use and procedure for the GaSonics Asher. If you do not follow these standards then your equipment eligibilty will be under review.
2005-2-4
All users are reminded that the maximum process time for each wafer is 1 min. Any user who runs the system for more than 1 min per wafer will be suspended from the system. They will be required to retake the training class and get rechecked off.
2005-2-25
The small sample holder has been repaired since it got broken yesterday.
2005-2-24
A user reported that the small sample holder for this system was damaged. It will be repaired tomorrow. Please contact Charlie at cs176@mail.gatech.edu if you need different sized sample holders. Right now the system supports 4" wafers and samples that are smaller than 1"x2" samples which can fit into the small sample holder.
2005-2-17
Today, a cleanroom user reported a problem with the loading arm of the Gasonics Asher. It turns out that one of the senors became disconnected. After reattaching the senor the system was once again fully functional.
2005-2-14
There are currently two recipes on this system. Recipe A is a one min recipe with the heater activated. Recipe 1 is a one min recipe with no heater.
2005-12-6
A user reported a low flow 1 error on the system. The oxygen gas bottled needed to be replaced.
2005-12-1
A user reported a problem his samples using the Gasonics Asher. There was an isolated incident where the cool grease did not keep the samples on the wafer. If any other users are experiencing problems, please submit a Pettit Request.
2005-10-27
This is a reminder to all Asher Users. The small sample holder is no longer needed. Users may mount a small sample to a 4" wafer using cool grease. Please contact staff if you need cool grease.
2005-1-7
Today the magnatron arrived and was installed on the gasonics asher. However the door limit switch issue will be dealt with first thing Monday morning.
2005-1-6
We expect the magnetron to arrive either tomorrow or Monday. As soon as the new magnetron arrives, we will install it and run test runs on the system to optimize the ash rate.
2005-1-4
The magnatron has been ordered and will be in Friday.
2005-1-28
Reminder: Currently, there is only one recipe available on the system (Recipe A, 1 minute). The other three standard recipes (Recipes 1, 2, and B) will be added on Monday. At this time, no other processing recipes are allowed on this machine.
2005-1-26
Yesterday, a cleanroom user reported a problem with the oxygen flow for the gasonics asher. A minor offset was detected in the system's MFC. Slight tweaking corrected the problem. Test runs were made to verify that the system is once again working. All gasonics users who have not responded to the email that was sent out Monday need to reply immediately to Charlie Suh.
2005-1-25
A cleanroom user reported a problem with gas number one being out of compliance. After investigation MiRC staff found a problem with the oxygen mass flow controller. We will be looking further into this problem tomorrow, but until then the system is once again logged down.
2005-1-24
The gasonics asher is up and running once more. If you experience any problems please contact MiRC staff.
2005-1-21
All of the repairs have been completed. However, we still need to perform some calibration and test runs. The Asher will be back up by Monday at 1:00 PM.
2005-1-14
We are still in the process of troubleshooting the electrical problems with the Gasonics Asher. Progress has been made but some sensor issues still need resolving.
2005-1-13
We discovered a problem with the control board for the system. The replacement parts will arrive tomorrow. We were unable to make any test runs since the control board was malfunctioning.
2005-1-12
After various test runs we are still troubleshooting the main motherboard of the Gasonics Asher. We expect the system to be down until early next week. We appologize for the inconvenience.
2005-1-10
As mentioned previously the new magnetron for the gasonics asher was installed last friday. Today's test runs show that the new magnetron is fully functional, however some unforseen issues have arisen regarding a few of the system's sensors. Additional troubleshooting will occur throughout the whole of tomorrow. Expect the system to be down until at least Wednesday.
2004-12-23
The replacement magnetron has been ordered. We will install it as soon as it comes in. We will need to run several test runs to optimize the system and ash rate.
2004-12-22
We discovered several problems with this system. We discovered that the plasma tube needed to be cleaned. There is another problem with the unload arm sensor. We will need to rewire the connector. The magnetron also needs to be replaced. Once the new magnetron is installed, we will need to run test runs to optimize the system.
2004-12-17
We have located a problem with the plasma detection system on the Asher. We are currently working on this machine, and will complete the repairs by Monday afternoon.
2004-12-16
We will replace a capacitor on the system tomorrow. Hopefully, this will resolve the plasma issues. We will let users know when this system is back up.
2004-12-15
We are still working on the plasma problem. We ran several test runs today, and have narrowed down the source of the problem. Tomorrow, we will remove some of the Asher parts to determine if they are working properly.
2004-12-14
The Asher is still down due to issues with the plasma. We will continue to look into this issue tomorrow.
2004-12-13
The Asher is currently down. Several cleanroom users have reported problems with the plasma. We will perform some tests tonight.
2004-12-10
The maximum run time for any recipe is 2 minutes. Also, after you process a wafer, you will have to wait 20 minutes before processing the next wafer.
2004-12-1
Reminder: Always keep the plastic cover on the machine when running this system. If you encounter any problems while using the Asher, please contact Charlie Suh.
2004-11-30
A cleanroom user is adjusting the pins on the sample holder arm. This causes other users' wafers to fall off the sample holder. Currently, the pins are set back to the default position. If you find that the pins appear to be misaligned, do not re-adjust them yourself, but contact Charlie Suh right away.
2004-11-29
Please remember to put the small samples holder back into the 4"x4" box. Do not leave it lying on top of the machine.
2004-11-10
A cleanroom user reported a problem with the unload step. If any other users experience a similar problem, please contact Charlie Suh.
2004-10-7
The Asher will be up later this afternoon. We have found the replacement parts needed to repair the sample holding bracket. Thank you for your time and patience.
2004-10-6
The Asher is currently down due to a broken holder bracket. We are in the process of looking for the necessary replacement parts. We apologize for the inconvenience.
2004-10-25
Reminder: There is a small sample holder available for this system. It can be found on top of the machine. Please do not try to put small samples on top of a normal wafer for processing in this system; your samples will slide off of the wafer. Please contact Charlie if you have any questions or issues regarding this machine.
2004-10-13
A cleanroom user reported a problem with the system shutting down. We examined the machine, and found a short in the system that was causing the breaker to trip. The problem has been resolved, and users may now use the system again.