2009-6-29
The tool is down until the issue with the ammonia regulator on its cabinet has been resolved.
2009-6-24
This tool is down until the tool owner examines it to ensure that there were no issues after the issue with the ammonia gas cabinet were resolved.
2009-6-23
This tool is down until the tool owner examines it to ensure that there were no issues after the issue with the ammonia gas cabinet were resolved.
2009-5-15
When the exhaust system was taken apart there are a few complications that will require the systems to be down longer than expected. A part needs to be fabricated at the GT machine shop. As soon as an expected finish time for this project is ascertained, we will send out another email.
2005-3-29
The Coyote PECVD will be brought down tomorrow morning as some changes aer being made to its gas lines.