2009-8-26 Information
The viewport issue has been resolved as well as the beam control issue.
2009-7-14 Calibration
The regeneration was completed late this afternoon. The tool is operational.
2009-6-29 Calibration
The system was cleaned as per normal procedures for monday.
2009-6-19 Calibration
A few users have reported issues with the beam control. They are reporting that the beams amplitude is moving on its own. We have not observed this behavior. test will be conducted test runs on Monday. Please monitor your runs and make sure that the beam is centered.
2009-5-26 Calibration
The metals have been refilled and cleaned.
2009-5-12 Calibration
The cryo had to be regenerated after an emergency stop button on a particular item was pressed. The tool was still being checked to ensure that it was functioning properly. It should be marked up in the morning.
2009-4-30 Calibration
Regeneration was done Tuesday night. System is up and running
2009-11-10 Calibration
The cryo pump has been regenerated.
2009-10-7 Calibration
The system will remain down until the arcing problem has been resolved. The problem will be further investigated tomorrow.
2007-9-6
The E-Beam is currently logged down. The cryopump crashed this morning, and is regenerating. It needs to continue cooling over night. An email will be sent out tomorrow once it has completed the regeneration process.
2007-9-28
The silver has been used recklessly. Too much silver is being deposited at one time. If this continues to happen, the crucible may become damaged. Please limit how much silver you deposit at once. If this continues, the silver may have to become an item that is checked out from a staff member.
2007-9-27
The Aluminum and Gold have been refilled. If you notice a metal that is below 50% or has a cracked crucible, please inform a staff member immediately.
2007-8-16
The E-Beam will be down until the cryo-pump is fully regenerated.
2007-6-21
The primary magnet for the E-beam 1 has been replaced. The system is available, but we are still fine tuning the beam control.
2007-5-1
E-beam 1 will be unavailable until tomorrow morning. The gold was refilled today, and please notify a staff member once any metal source reaches 50% or less.
2007-4-4
A user reported a problem with the power source today. We are looking into the problem and hope to have it fixed tomorrow.
2007-4-30 Reminder
We will be regenerating the E-beam starting tomorrow, as well as cleaning the gun. Please remember to make sure your deposition rate is 3A/sec or lower. If you would like to deposit at a higher rate, please contact Charlie.
2007-4-27
Your deposition rate for the E-Beam 1 and E-Beam 2 should not be higher than 3 Ang/s. If your deposition rate is higher than this, please contact a staff member to get permission.
2007-4-20 Cryo Pump Regeneration
A regeneration of the cryopump was initiated this morning, and is still in progress. An email will be sent when the E-beam is available again.
2007-4-18
A user reported a problem with the interlock lights. We discovered that one of the sensors at the top of the chamber was not working properly. We have temporarily adjusted the sensor and will look for a more permanent solution tomorrow.
2007-4-17
We have adjusted the tooling factor for the Nickel in the E-beam 1 as well. We are also investigating the Titanium Gold deposition in the E-beam 1, but have noticed no problem with just Gold depositions. If you notice a problem, please contact staff.
2007-3-9 Information
Next week we will be performing quality tests on the E-beam gold source. The results from the Noran EDS will be sent out to all of the E-beam users.
2007-3-26 Information
The Au recipe has been fixed. A test run today yielded only 1% higher (606A) error than the setpoint (600A). A graph showing the pressure vs. pumpdown time curve has been placed on the right side of the control panel.
2007-2-23 Electron Beam Power Supply
A user reported a problem with the power settings for Au. We have made adjustments to the power settings to keep the power from ramping up too high. If you get the error message 'Max Power Error' it means that you did not center the beam properly.
2007-11-6
The E-beam is back up and running. The problem with the hoist has been solved. Thank you for your patience while we solved this problem.
2007-11-5
The E-beam will be down until tomorrow due to a problem with the hoist. We appologize for any inconvenience this may cause you.
2007-11-26
Please remember to check the other E-beam before pumping down. The two systems share a roughing pump. Switching from one system to the other while pumping down is not good for the pump and could cause it to fail. Please be courteous to other users and let another user finish pumping down before beginning.
2007-11-14
The E-beam Evaporator is back up. Thank you for your patience while we solved the problem on the machine.
2007-10-8
The E-beam is still down. We are trying to solve the problem as quickly as possible and would like to thank everyone for their patience.
2007-10-5
The E-beam is currently down due to a water problem. We apologize for any inconvenience.
2007-10-30
Please remember to unscrew all screws and place them, and the clips, in their appropriate amber bottle. Then stack the plates on top of the clear cabinet.
2007-10-26
The metals have been filed on the E-beam evaporator. If you notice a metal that is low, please let a staff member know.
2007-10-16
We have solved the problem involving the hoist getting stuck. Also, the beam will now respond in the longitude direction. Thank you for your patience while we solved these problems.
2007-10-11
The metals will be refilled tomorrow morning.
2007-10-10
The metals in the E-beam 1 have been refilled. Please let a staff member know if the metal is getting low, and do not use a crucible that is less than 50% full.
2007-10-1
We have brought a new plate into the cleanroom for the E-beam evaporators. It is designed to hold one 4" wafer. If you have any questions about it, do not hesitate to ask a staff member.
2007-1-4 Information
The gold crucible has been refilled. All users need to remember that they need to check the levels of all metals they plan on using.
2007-1-29 Information
The Al crucible has been replaced with a new one. If any user sees any cracks, or a piece of broken crucible embedded in the sample, do not attempt to use the source material.
2007-1-25 Reminder
All users are reminded to verify that the shutter is closed before hoisting down.
2007-1-23 Information
We are performing test runs to examine the quality of samples deposited with Cr. We have found that an evaporation of 1 micron yields undesirable results.
2007-1-12 Reminder
Both systems are temporarily attached to the same roughing pump. Therefore if both E-Beam Evaporators try pumping out at the same time, one will fail. Please be curteous and wait until the other E-Beam has switched to the Cryopump before starting.
2007-1-11 Cooling Water
A user reported a problem with the water interlock. The problem has been investigated, and the water interlock has been working since. If you encounter further problems, notify the staff.
2006-9-29
A user reported problems with the aluminum power supply settings. We ran test runs and the correct settings are now in place.
2006-9-13
A user reported a problem with the viewport. The kapton film on the viewport needed to be replaced. We took the viewport off and replaced the film.
2006-6-29 Information
A user reported a problem with the shutter hitting one of the posts. The shutter had been bent. This usually happens when the chamber is lowered on top of the shutter to cause it to get bent.
2006-6-12 Information
The E-beam Evaporator will not be available on Wednesday. The system will be logged down Wednesday morning. The compressor for the system needs to be moved and new hoses will be attached. We hope that a regeneration will not be needed, but just in case, we are scheduling the system to be down all day.
2006-5-30 Information
A user reported that a sign had been left on the E-beam to notify users that the system was down. We discovered that the seal had been pulled off of the chamber. The only way this is possible is to left the chamber up before the system is fully vented. Please remember that you must wait atleast one minute before hoisting the chamber up.
2006-5-3 Information
A user reported a problem with the iron crucible. Please be sure to report any problems with the crucibles right away. That way we can replace the crucible as soon as possible.
2006-5-24 Information
A few users reported pump down problems on this system. There was a small water leak from a loose fitting. The fitting has been tightened, and the system started to pump down normally late this afternoon.
2006-5-16 Information
We have discovered that the ramp and soak times have been changed on some of the recipes. Users are not permitted to change these times. Any users who are caught changing any of the settings will be suspended from the tool. No warning will be given.
2006-4-5 Information
We ask that all users check the level of material before making your run. If you are not sure if the material is low, have a staff member check it for you. If you know that the material is low, please do not just use the system and report that the crucible is getting low.
2006-4-24 Information
This is a reminder that the metals in the system can only be refilled by the staff. Any users who refill the metals will be suspended from the machine.
2006-4-19 Information
This is a reminder to all users that the maximum deposition rate for both E-beam evaporator systems is 3A/s. A user reported a problem with evaporating gold. The beam was not heating the gold high enough for evaporation. We made an adjustment to the power settings to resolve this problem.
2006-4-12 Information
Several users have reported a problem with the beam control on the E-beam. We have made an adjustment to the positioning magnets to help focus the beam a bit more. This should resolve the problems with focusing.
2006-4-11 Electron Beam Focus
A user reported a problem with the beam focus. The positioning magnets were cleaned early this afternoon. Users should have more control over the beam now.
2006-3-29 Information
A user reported a problem the Copper evaporation late this afternoon. We will be running test runs on the Cu tomorrow morning.
2006-3-21 Information
While running a test run on the system, we discovered that two of the interlock lights were not being met. The system was logged down early this afternoon. The cause of the problem was on the chamber. A modification has been made to the chamber. We hope this will prevent the problem from happening again.
2006-3-20 Information
We have noticed that the rates for some of the metals have been set to 5 A/s. The Al was one of the materials set to this rate. The crucible for the Al was damaged over the weekend. It was replaced this morning. All users are reminded that the maximum rate for all metals is 3 A/s. Any users who are caught running at a higher rate, will be suspsended from the machine.
2006-3-14 Information
The system was temporarily logged down due to a problem with the valve controller. The system would not vent when the vent button was pushed. The problem has been fixed.
2006-12-4 Information
The gold crucible has been refilled. Please remember to check each crucible before you make your run.
2006-11-7
All the metals have been refilled, including silver.
2006-11-30
The mechanical pump on this system was leaking oil so it had to be removed. We are currently trying to find a replacement and hope to have the machine back up by this evening. Please check the website to see the updated status.
2006-11-14
A new aluminum crucible was installed yesterday. Please check all the metals you are going to use before you pump the system down to see that they are all clean and full. Also, please make sure that you center the beam so that it does not hit the crucible.
2006-10-3 Information
This tool now takes about 30 minutes to reach 3.0 * 10^-6 Torr, which is a bit slower than before.
2006-10-27
A user reported a problem with the platinum. We will look into the problem later today.
2006-10-2 Information
The tool is back up. The regeneration was completed late this afternoon, and the problem was that the hi-vac valve was not closed all the way. You need to make sure the hi-vac valve closes before you vent the chamber. You should hear it close.
2006-10-12 Vacuum Pump
For the moment, E-Beam 1 and E-Beam 2 both share the same mechanical pump, so the pumpdown time will be greater. Please allow an additional two minutes for the machine to pumpdown.
2006-10-10
The chamber shield was cleaned this morning. If anyone has any problems lowering the chamber lid, please report the problem on the Pettit request page.
2006-1-26 Vacuum Pump
We are currently running uniformity test runs on the system. We are aware that some improvements need to be made. We are in the process of developing a better method to hold samples.
2005-9-29 Information
The regeneration was completed early this morning. The system has been logged up since then. A problem with the lateral control was discovered during the training session this afternoon. There was a loose connection on the gun. The connection has been fixed.
2005-9-28 Information
A user reported a problem with the vacuum early this afternoon. We found that the cryopump had failed. We are currently investigating the problem. The cryopump is being regenerated, and we will need to run a few test runs in the morning.
2005-9-21 Information
A user reported a problem with the Al crucible. We discoverd that the shutter was preventing the sensor from detecting any deposition. The shutter has been adjusted to allow the sensor to make measurements.
2005-9-2 Information
The Al crucible and the mirror were damaged late this afternoon. A new crucible was made and has been installed. If you are having trouble seeing the beam, please contact staff right away.
2005-9-2 Information
A user reported a problem with the cut back light. We found that the filament had a broken connection on it. The connection was replaced, and the system was logged back up.
2005-9-12 Calibration
The gold crucible has been refilled. A user reported that the Al crucible had a crack in it. We will monitor the condition of the crucible and replace it when necessary.
2005-9-1 Information
The E-beam was logged down earlier today to be sand blasted. We hoped that the sand blasting would reduce the out gassing. We will be running some more test runs tomorrow.
2005-8-9
Today a cleanroom user reported that the they were unable to properly align the beam during operation. Staff cleaned and replaced the film over the view port. Aligning should once again be easily performed.
2005-8-8 Information
A user reported a problme with the cut back light. One of the lines in the back was causing a short. We have moved the wire out of the way to temporarily fix the problem. We will be ordering some ceramic beads to completely fix the problem.
2005-8-31 Information
The out gassing in the chamber has become a major problem. We will be logging the system down tomorrow morning to be cleaned and sand blasted. We apologize for the inconvenience. The system should be back up by the afternoon.
2005-8-29 Information
A user reported that there was a problem with the interlock lights. We found that there were some particles in the filament causing a short. Another user reported a problem with the lateral controls. We found that there was a connection problem. Both problems have been resolved. A third problem was reported involving the pressure. The pressure was increasing after the filament had been turned on. We believe that this is due to out gassing from the tooling. We will schedule a time to clean the tooling within the next few days. If the problem becomes too severe, we will log the machine down sooner.
2005-8-2
Users reported that for some metals they were having difficulties aligning the beam. Some minor adjustments were made to the position of the magnets which have proven to make alignment easier. If you are still have problems aligning certain metals please contact Charlie Suh.
2005-8-19 Information
The gold level in the crucible is at about 50% full. We will refill the crucible tomorrow. Please remember to check the levels of each metal you plan on using before you use the system.
2005-8-17 Information
The system has finally been rapaired. There were several components in the controller that needed to be replaced. The coil in the E-beam gun also had to be replaced. There damage was caused by a short in the system. We are in the process of installing some more insulation to the line that caused the damage.
2005-7-6
A cleanroom user reported that the pump down times for the E-Beam to reach appropriate deposition pressures was outrageous. In response to this the cryo pump was regenerated and normal pump down times were restored.
2005-7-22
The vacuum controller for the E-Beam is still undergoing repairs. Until then a controller from the E-Beam 2 system is going to be used in its place. The system is currently undergoing regeneration and should be accessable tomorrow.
2005-7-21
Multiple issues arose today in regards to the E-Beam Evaporator. The automatic control system failed today, we will repair this control problem and regenerate the system in hopes of making it available for use tomorrow evening.
2005-7-12
The cryo-pump has been regenerated and test runs show that the E-Beam 1 is working as intended.
2005-7-11
The E-Beam Evaporator has had its cyro- pump regenerated today. We have found that people are pressing "Stop" and "Vent" without pausing and thus the valve to the cryo pump has not been closing. With the cyro pump being open to the atmosphere the pump has been crashing more frequently. In order to help preserve the cryo-pump's life, please count to 3 after pressing the "Stop" button before venting the chamber.
2005-6-8
This morning, a cleanroom user reported that they were receiving a "Shutter Delay" warning and their process would abort. Be sure that when you go to deposit your metal that your beam is actually well focused and not hitting the crucible. If there are any questions as to how to properly focus the beam please contact Charlie Suh.
2005-6-7
A note to all E-Beam users: remember that the maximum deposition rate for any metal is 3 angstroms/minute. If you wish to deposit at a higher rate you must submit a viable reason and show that it is crucial to your research. For those who do not have permission to run at higher rates, if you are caught exceeding this rate your access will be removed from this system.
2005-6-13 Electron Beam Focus
Several users have reported that they are having problems with the Al evaporation. Please contact Charlie at cs176@mail.gatech.edu if you are having a problem. He will try to supervise your run.
2005-6-10 Electron Beam Power Supply
A user reported that the breaker to the power supply had been tripped. The breaker needs to be replaced. We have a replacement breaker in our storage room. We will need to log the system down to replace the breaker. An email will be sent out to all E-beam users to let them know when we plan to replace the breaker. The system is still usable, but the breaker may trip. Please contact Charlie at 404-925-2047 if this happens.
2005-5-5
The E-Beam's tooling underwent some sandblasting today. The system is also undergoing a full regeneration. Both actions are in hopes of clearing up the pressure problems that have been occuring lately for this system.
2005-5-4
Lately multiple cleanroom users have reported fluctation in process pressure while they were running the E-Beam. We are currently in the process of investigating the cause of this problem.
2005-5-25 Reminder
A user reported a problem with the Al crucible. They reported that there was poor film quality. We discovered that the Al had oxidized. Please remember to allow a few minutes for the crucible to cool down before you vent the system. Also, users are encouraged to inspect the metals before you use them. If is any kind unusual discoloration, please report it immediately.
2005-5-23
All metals in the system have been refilled. Also, the maximum deposition rate for this system is 3 A/sec. If you need to run a higher deposition rate, please contact staff and let us know why.
2005-5-19
Today, a cleanroom user reported that the beam in the Old E-Beam Evaporator system was not properly aligning. A loose wire was causing the beam controller to lose its lateral control. The wire has been reattached and the system is once again fully functional.
2005-5-18
The E-Beam Evaporator has completed its regeneration and had its shorts fixed. The system is once again ready for cleanroom processing.
2005-5-17
The E-Beam Evaporator is currently marked down due to a large short that caused the system to crash. We are currently regenerating the system. Once the system has been regerated we will be able to address the shorting problems that occured.
2005-5-16
During a process today, a cleanroom user reported that the cutback light had come on stopping their run. We are currently in the process of procuring a more permanent solution to this re-occuring problem.
2005-5-11
A user reported that the electron beam was not coming to a pinpoint focus in the system. Staff removed and cleaned the positional magnets within the electron gun, and the beam is now focusing properly.
2005-4-7
If any E-Beam user notice that the metal sources are starting to run low please contact MiRC Staff.
2005-4-6
The E-beam Evaporator is once again ready for cleanroom user after its tooling was sandblasted and reinstalled.
2005-4-5
Reminder: the E-Beam Evaporator will be brought down tomorrow morning as its tooling it being sand blasted.
2005-4-4
The E-Beam Evaporator had its metals refilled today. Expect this system to be brought down for some pre-maintenance, as its tooling needs to be sand blasted.
2005-4-25
Today, a cleanroom user reported that they found the E-beam Evaporator not under vacuum. This user went to pump down the system and found that it required an extraordinary amount of time to pump down to processing pressure. We and this user are urging all Evaporator users to remember to pump down the system once they have finished using it.
2005-4-19
The E-beam Evaporator has been logged back up after its cryo-pump was manually cooled and restored to standard operating conditions.
2005-4-13
Today the E-Beam had its Gold crucible refilled. A little reminder to all E-Beam users, the maximum deposition rate for all metals is 3 A/sec.
2005-4-1 Information
Next week, either Tuesday or Wednesday, we will schedule time on the E- beam Evaporator for sandblasting. During this time, the machine will be down for approximately three hours.
2005-3-9
The E-Beam Evaporator is once again available after its isolation valve was cleaned. The trainers of this system want to once again remind users to vacuum around the chamber seal. They also want to urge careful handling of all crucibles.
2005-3-8
There were some problems with the regeneration today. The cryopump would not stay pumped down, so we made some adjustments to the valve. We are attempting another regeneration tonight. If the regeneration fails, then we will have to take out the valve tomorrow.
2005-3-7
Late this afternoon, the E-Beam Evaporator was caused to crash by a cleanroom user. This user's access has been removed because of their actions. We will be regenerating the system over night. Look for a future email regarding the status of this equipment.
2005-3-4
Today, a cleanroom user noticed that the chromium crucible had its center metal depleted and no longer contained any chromium. The chromium was remelted, replenished, and is once again ready for cleanroom use.
2005-3-3
Today, the view port for the E-Beam was cleaned making it easier to see the crucible during alignment and focusing.
2005-3-29
Next Monday the Ebeam Evaporator will be scheduled down as staff sandblasts it's tooling.
2005-3-24
The CVC E-Beam has had its metals refilled today. Also, this system will be brought down tomorrow from 8am to 12pm.
2005-3-15
When using either of the E-Beam Evaporators be mindful of your beam positioning. This is something that was covered in your training sessions and should proceed throughout your use on these systems.
2005-3-1
Reminder to E-beam users, you are not allowed to increase the deposition rate for any of the materials that are programed in the system. For example the copper recipe is set to 3 A/sec you are not allowed to increase this value. If we find that you have altered a set deposition rate for any of the materials on this system your equipment privileges will be under review.
2005-2-9
A cleanroom user reported that the E-Beam Evaporator was not properly pumping down. MiRC staff noticed that the cryo-pump had crashed and is currently being regenerated.
2005-2-7
The metals for the CVC E-Beam Evaporator were refilled today. Also if any users need to be checked off on this system please contact Charlie at cs127@mail.gatech.edu.
2005-2-4 Information
The E-beam finished regenerating early this morning. We needed to run some pump down test runs late in the morning. The system pumps down to 3.1 x 10^-6 Torr in 30mins. The sample holder and e-beam gun have also been cleaned. This helped resolve the issue we were having with the pressure increasure during deposition. Please remember to widen the beam as far as possible without hitting the crucible.
2005-2-3 Information
The various components of the E-beam have been taken out and cleaned. We hope that this will resolve the problem with the pressure increase during deposition. We are currently waiting for the cryopump to finish regenerating. As soon as the system becomes available, we will send an email out.
2005-2-28
Over the weekend a cleanroom user reported that the high power light had shut off during their run. Upon investigation we found that the main power circuit breaker had tripped. We have noticed that as of late this has been a re-occuring problem. We are currently looking in to replacing the circuit breaker and/or looking in to replacing the power supply to come up with a more permanent solution.
2005-2-25
The gold crucible has been refilled since users reported it was low.
2005-2-24
A user reported an inconsistency with the deposition measured and the thickness programmed using the Al. We will be running calibration test runs on the system over the next few days.
2005-2-23
CVC Ebeam users are not permitted to alter the deposition rates for any of the recipes that are being used. If you do want to deposit at a higher rate please contact Charlie Suh.
2005-2-22
If you plan on using the CVC E-Beam Evaporator tonight and you find that you are unable to hoist up the chamber eventhough you are logged into the machine, gently tap the access controller box to remedy this slight glitch. We will be permanently fixing this problem first thing tomorrow.
2005-2-2 Miscellaneous
The E-beam is currently down. We are still in the process of resolving the problem with increasing pressure during the deposition step. The system will be regenerated tomorrow. All check-off sessions for tomorrow, Thursday, Feb. 3 are cancelled until further notice. The trainer will re-schedule check-off sessions.
2005-2-18
Today the iron metal crucible was refilled today. If you have any additional problems or concerns with the CVC E-Beam please contact Charlie Suh.
2005-2-17
New sample holders have been fabricated and can be used to mount samples for either of the E-beam systems.
2005-2-11
Several users have reported a problem with depositing Al. We will run test runs on the Al on Monday.
2005-2-1 Deposition Controller
A cleanroom user reported a problem with the power controller. Something was causing the cut back light to illuminate. A flake of metal was discovered within the filament causing a slight short. If you have any additional problems with the system please contact MiRC Staff.
2005-12-6 Cryo Pump Regeneration
A user reported a problem with the cryopump over the weekend. The regeneration was completed last night. The crucible were all refilled.
2005-12-19 Information
The primary magnet for the e-beam gun has been replaced. The required power for each material is now higher than before. Users can expect the power level for the gold to reach about 35-40%. If any users have a problem aligning the beam, please report it immediately. We are still trying to fine tune the system with the new magnet in place.
2005-12-1 Electron Beam Focus
Several users have reported problems with the power supply and the beam over the last week. We have made a few modifications on the system to resolve these problems. A few more test runs need to be made on the E-beam gun to make sure the system is working properly. Please remember that gold and aluminum are in thick walled crucibles. The beam size for these materials needs to be small.
2005-11-9 Calibration
The calibration for the Tungsten filled crucible will be completed tomorrow morning. Once the calibration is finished, tungsten will be available for evaporation in the E-beam 1.
2005-10-4 Information
The system was logged back up this morning. A user reported a problem with the e-beam position controller. The main connection to the controller was not secured. The system was logged back up late this morning.
2005-10-27 Information
The heater on the e-beam has been removed. If you need the heater on this system, please contact Charlie.
2005-10-26 Information
A user reported that the level of Al in the crucible was low. The crucible was refilled. If any of the metals in the crucibles seem low, please contact staff immediately.
2005-10-11 Information
Please remember to check the levels of each crucible before using them. We discovered that the level of the chrome had gotten down to about 20%. If the any of the metals get this low, please notify staff as soon as possible.
2005-1-7 Information
The new CVC E-Beam Evaporator has been fully installed and can be found next to the old E-Beam Evaporator and the SEM in the metallization bay. Training sessions on this system can be expected to occur as quickly as next week. The Old E-Beam Evaporator has had all its metals refilled today and is ready for use. If any user experiences any problems involving this system please contact MiRC Staff.
2005-1-6 Information
A user reported a problem with the power supply. One of the breakers tripped on the system. If you find a sign on qny equipment stating a problem, please do not attempt to use the system.
2005-1-28
Please let us know if you notice any pressure fluctuations during evaporation. Don't forget to list details such as initial processing pressure and deposition material.
2005-1-25
A cleanroom user reported that the process pressure has been fluctuating. We will be scheduling time to leak check the system for later this week.
2005-1-24
Note: the cleanroom staff will be performing a leak check on this system first thing tomorrow morning. Expect minimal downtime for this system.
2005-1-18 Information
A cleanroom user reported that the cut back light was coming on preventing them from using the high vac lamp and thus shutting down the system. Upon investigation a small short was detected inside the filament causing the system to arc. The system is now working. The metals for the CVC E-beam were refilled.
2005-1-13 Information
A user reported a problem with the Al crucible having a small crack in it. The crucible has been replaced with a thick walled crucible. Please narrow the beam when using Al.
2005-1-11 Information
CVC: A cleanroom user reported that the crucible selector was not aligning properly. After minor tweaking the selector is once again working as it should. Reminder though to E-Beam users to check to make sure the crucible selector is working before they pump down the chamber. NEW: Instructions for the newly converted E-Beam have been posted online for users to view. If you wish to learn how to use this machine please take a look at these instructions, and expect training to take place starting sometime this week.
2004-12-6 Cryo Pump Regeneration
The cryo pump had crashed over the weekend. The regeneration will be completed later this evening; afterwards, we will conduct a test run to check the system's performance. We will send out an e-mail when the E- beam is back up for use.
2004-12-17
A cleanroom user reported a problem with the pump down time. We ran several tests, and the system went down to 1.0 E-6 in 40 minutes. If you experience any pump down problems, please report them to a staff member.
2004-12-15 Information
Reminder: The maximum deposition rate for aluminum is 4 A/s. We have added an extra end step to the aluminum recipe; now, there is an additional 5 minute ramp down time. After this ramp down step, you will still need to wait until the crucible has stopped glowing completely before venting the system.
2004-12-10
Reminder: Please check the metal level in the crucible before you begin using this system.
2004-12-1 Electron Beam Focus
We have made some adjustments to the system so that now the beam is more focused. If you notice any problems with the beam, please notify Charlie Suh.
2004-11-9 Vacuum Poor
We are still experiencing issues with slow pump down time on the E-beam. We have leak checked the system and performed test runs. We will continue to address this issue, and keep users posted on the status of the E-beam.
2004-11-8 Cryo Pump Regeneration
The cryo pump was replaced this morning, and the replacement pump was regenerated today. We have observed a large build up of carbon inside the chamber. The carbon is from users hitting the crucibles with the electron beam. If you have any questions at all about whether or not you are running the system correctly, do not hesitate to ask a staff member. The machine will be down tomorrow until we can complete a mechanical clean inside the chamber.
2004-11-5 Miscellaneous
Reminder: no cleanroom user is allowed to change out the materials in the E-beam. Also, no one is allowed to change any of the deposition parameters. Anyone who does so will be suspended from the machine. If you would like to change the deposition rate, please contact a staff member. If you have any questions regarding these policies, please contact Gary. The E-beam will be down Monday morning so that we can change out the cryo pump. We will let users konw when the E-beam is back up for use.
2004-11-4 Reminder
No cleanroom user is allowed to change out the materials in the E-beam. Also, no one is allowed to change any of the deposition parameters. Anyone who does so will be suspended from the machine. If you would like to change the deposition rate, please contact a staff member. If you have any questions regarding these policies, please contact Gary.
2004-11-3 Reminder
Today, another user attempted to re-fill the metal in a crucible. Cleanroom users are not allowed to re-fill the materials crucibles themselves. Always check the level of the metal before using this machine. If you notice that the metal is running low, contact a cleanroom staff member. Do not try to replenish the metals yourself.
2004-11-29 Crucible Refilled
Today, the crucibles were re-filled. If you notice that any of the metal levels are getting low, please contact Charlie Suh.
2004-11-22 Crucible Refilled
The materials have all been replenished in the E-beam. If you notice that a crucible level is getting low, please report it to an MiRC cleanroom staff member.
2004-11-2 Reminder
Reminder: Cleanroom users are no longer permitted to change out the material crucibles on their own. Normally, the following metals are available in the E-beam: Slot 1: Titanium Slot 2: Chromium Slot 3: Gold Slot 4: Nickel Slot 5: Aluminum Slot 6: Copper If you would like to use any other material in the E-beam, you will need to contact a staff member. You will only be able to use other materials when a staff member is present at the MiRC: between 8AM and 7PM. If you have any questions, please contact a cleanroom staff member.
2004-11-19 Reminder
Reminder: Don't forget to check the material level in the crucible before you begin your process. If you notice that the metal is getting low, please contact a staff member.
2004-11-18 Miscellaneous
A cleanroom user reported that the system will pump down much faster now. If you notice any issues with the E-beam, please contact Charlie Suh.
2004-11-15 Cryo Pump Regeneration
Last night, a cleanroom user reported that the cryo pump had failed. The regeneration process was completed this morning, and the E-beam has been marked back up. If you observe a longer than normal pump down time, please notify an MiRC cleanroom staff member.
2004-11-12 Information
We have finally located the source of the leak in the E-beam. The system will be logged back up later tonight. If you ever observe any pumping issues with this system, please contact a staff member.
2004-11-11 Vacuum Leak
The regeneration process was completed last night. Today, we leak checked the system and tried to isolate the source of the pump down problem. We have changed out the compressor, and are currently running some more tests on the system. We will keep users posted on the E-beam's status.
2004-11-10 Cryo Pump Regeneration
We have changed out the cryo pump again, and the system is currently in the regeneration process. We will send out an e-mail later tonight or tomorrow updating users on the E-beam's status.
2004-11-1 Information
The cleanroom staff found that a cleanroom user had left the palladium crucible in Slot 1 of the E-beam. Another cleanroom user mistakenly assumed the crucible contained titanium, and since the metal level was low, attempted to re-fill it himself, thus coating the palladium with a titanium layer. Please be reminded that cleanroom users are not permitted to re-fill crucibles themselves. If a metal needs to be replenished, please contact a cleanroom staff member. Because of this incident, cleanroom users will also not be allowed to swap out crucibles themselves. If you would like to use a metal that is not currently in the E-beam, you will need to contact a staff member. This also means that you will only be able to use metals not normally found in the machine on weekdays, Monday - Friday, from 8AM until 7PM.
2004-10-28 Shutter
The automatic shutter control on the E-beam evaporator has been fixed. We believe that this will no longer present a problem. Any further problems with this equipment should be directed to cleanroom staff.
2004-10-25 Cryo Pump Regeneration
A cleanroom user reported that the E-beam would not function properly. We examined the system, and found that the cryo pump had crashed. We are currently performing a regeneration process; the E-beam will be available later this evening. Several users have reported problematic pump down times. We are in the process of resolving this issue. We will run test runs on the system later tonight to see if there is any improvement.
2004-10-21 Information
We have changed out the emitter on the E-beam. The system is back up for use now. Please notify a cleanroom staff member if you have any issues while using this equipment.
2004-10-20 Miscellaneous
Reminder: No cleanroom users are allowed to change any power settings without first contacting an MiRC cleanroom staff member. Changing equipment settings is Violation #21 of the MiRC Cleanroom Policy (http://grover.mirc.gatech.edu/userservices/cleanroompolicy.shtml). Also, the gold crucible was replenished today.
2004-10-19 Miscellaneous
A cleanroom user reported that the crystal monitor holder was missing. Upon inspection, we found that it had fallen into the bottom of the chamber. When you change out the gold sensor, please make sure that the holder is fully secured when you put it back into the system. If you have any other issues with this system, please contact an MiRC staff member.
2004-10-12 Cryo Pump Regeneration
Last night, the cryo pump regeneration failed due to a problem with the high vac valve. Today, we leak checked the system, and restarted the cryo pump regeneration. The regeneration will be done early this evening. We will send out an e-mail when the system is back up for use.
2004-10-11 Cryo Pump Regeneration
The mirror in the E-beam was damaged inside the system. The glass fragments caused the high vac valve to malfunction, which in turn caused the cryo pump to crash. We are currently regenerating the system. In the future, please report any broken mirrors immediately to the cleanroom staff. The E-beam will be back up tomorrow once the regeneration has been completed.
2000-4-3 Crucible Pocket Alignment
Earlier today we found the the crucibles were out of alignment and that this was causing the electron beam to hit the crucible during a users run. We have realigned the crucible tray. If you find the crucibles out of alignment, please report it immediately.
2000-3-30 Crucible Pocket Alignment
A user reported that the crucible pockets were misaligned. We also found that the protective film for the viewport had become loose. We realigned the crucible pockets and fixed the film.
2000-3-30 Vacuum Poor
The e-beam's poor pumping was caused by low helium pressure in the cryo compressor. We have replaced the compressor. The e-beam is pumping very well now. After pumping overnight it had reached 3.0 x 10^-8 torr.
2000-3-3 Miscellaneous
We are currently installing an access control card reader on this system. We expect to have it installed by the time the cleanroom reopens on the 13th.
2000-3-29 Cryo Pump Regeneration
We found that the cryo pump compressor helium pressure was low. This is probably the cause of the poor pumping that we have been experiencing lately. We are still waiting for the cryo pump to cool down.
2000-3-22 Cryo Pump Regeneration
The e-beam cryo pump was regenerated last night. This has fixed the poor pumping performance we were experiencing earlier in the week.
2000-3-21 Vacuum Poor
The e-beam is experiencing vacuum problems. We will be regenerating the cryo pump tonight. Hopefully this will correct the problem.
2000-3-20 Deposition Controller
The deposition controller experienced a crystal failure error in the middle of a deposition. We have replaced the sensor crystal.
2000-3-14 Electron Beam Power Supply
A user reported that the cut back light would not go off on the electron beam power supply. We determined that the power supply had been shorted out by a metal flake. We removed the metal flake. The system is working now.
2000-3-10 Cryo Pump Regeneration
We performed a long purge on the cryo pump and restarted it.
2000-3-1 Crucible Pocket Alignment
The crucible rotation mecahism became loose preventing the crucible pockets from rotating properly. We have realigned the turntable and tightened the system.
2000-2-9 Miscellaneous
The machine shop has finished refinishing the high vacuum valve housing. We have reinstalled the valve housing and cryo pump. The e-beam gun was removed today to be rebuilt.
2000-2-8 Miscellaneous
We are continuing to work on the high vacuum valve.
2000-2-7 Miscellaneous
We have removed the hi-vac valve from the evaporator. The valve has been sent to the GTRI machine shop to be refinished.
2000-2-4 Vacuum Leak
The high vacuum valve in the e-beam evaporator was SERIOUSLY damaged by chrome pellets that were dropped onto the valve. This is a very difficult problem to fix. We will have to entirely remove the cryo pump and high vacuum valve assembly (two big parts) from the system. We do not expect to have the evaporator working any earlier than late next week.
2000-2-3 Cryo Pump Regeneration
The fuse for the e-beam control circuitry blew earlier today. We have replaced the fuse. The evaporator was off long enough to allow the cryo pump to lose vacuum. We are currently regenerating the pump and expect it to be available tomorrow morning.
2000-2-28 Electron Beam Focus
Several test runs were made today to adjust the focus on the E-beam. The beam is now focused.
2000-2-25 Deposition Controller
The problem with aluminum has been resolved. We have adjusted the deposition controller to correct the problem.
2000-2-24 Electron Beam Power Supply
Several users have reported problems with the aluminum splattering out of the crucible during deposition. We are trying to find out what is wrong.
2000-2-22 Crucible Pocket Alignment
The crucible pockets were out of alignment. We have realigned the crucible turntable. Please check to be certain that the pockets are aligned properly before starting your run. If the crucibles are not centered serious damage can occur. Contact MiRC staff if the pockets are not aligned correctly.
2000-2-18 Crucible Refilled
We have finished refilling all of the metal crucibles, including the nickel and platinum crucibles.
2000-2-17 Electron Beam Power Supply
A user reported that the "cut back" light on the power supply was flashing. We determined that the electron emitter leads were shorted in the back of the chamber. This problem has been corrected and the e-beam is now working properly. All metal crucibles will be filled completely later today.
2000-2-16 Miscellaneous
The e-beam gun has been reinstalled and the crucibles have been replaced and refilled. The e-beam is now operational.
2000-2-15 Miscellaneous
The system is back up now. The valve and e-beam gun have been repaired. We are currently refilling the crucible pockets. If you are not comfortable operating the e-beam, please ask for assistance before you break it.
2000-2-14 Miscellaneous
The e-beam remains down due to a problem with the e-beam gun. In addition, one of the thermocouple pressure gauges was damaged when the high vacuum valce was removed and must be replaced for proper system operation. We expect to have a replacement thermocouple Wednesday.
2000-2-11 Miscellaneous
A user inadvertantly turned on the cooling water pump, causing water to enter the cryo pump. We have removed and drained the pump and will be purging it with nitrogen overnight. We hope to have the e-beam operational by early next week.
2000-2-11 Miscellaneous
The high vacuum valve has been replaced. However, the electron gun was rebuilt and did not fucntion properly afterwards. We will be investigating this problem further on Monday.
2000-2-1 Crucible Refilled
A new chrome crucible has been installed. We ran several successful test runs.
2000-1-7 Crucible Refilled
The crucible pockets have been refilled. Once again, we would like to remind all e-beam users to let the materials cool for several minutes before venting the chamber.
2000-1-6 Crucible Refilled
The titanium in the e-beam has been destroyed by a user who vented the chamber without allowing the metal to cool. It is extremely important to allow the metal to cool for at least several minutes after the deposition and before venting the system. We have replaced the titanium. Most of the metal crucibles in the e-beam need to be refilled. We will be refilling them tomorrow morning.
2000-1-25 Deposition Controller
A user reported an extremely high deposition rate while operating the evaporator. We tested the evaporator and experienced no problems.
2000-1-21 Test Run
A user reported an inconsistent deposition rate while evaporating nickel. We ran a test run using nickel and did not experience any problems.
2000-1-19 Electron Beam Power Supply
A user reported erratic beam movement while operating the evaporator. We have run several test runs and it appears that the system is running properly.
2000-1-11 Test Run
We made a test run of the E-beam evaporator using the equipment procedures. We did not experience any major problems.
1999-9-9 Information
The ion gauge on the system has been modified. It is no longer necessary to turn the power on and off when venting or pumping the system. It is linked to the high vacuum valve and will turn on approximately 15 seconds after the high vacuum valve opens. It will turn off immediately as the high vacuum valve closes. Note that only the tube turns on and off. The display will continue to show a "10". The tube is on when a small LED located just to the left of the "10" lights.
1999-9-20 Shutter
A cleanroom user reported a hissing sound. We later discovered that the valve controlling the shutter was leaking. We replaced the valve and performed several test runs. The system is now functioning properly.
1999-7-27 Crucible Refilled
The aluminum crucible has been replaced and refilled.
1999-7-22 Information
The e-beam power supply has been moved into the utility chase to increase lab space. This should have little effect on lab users.
1999-6-24 Information
Several more tests need to be run on the Lead. The tooling still needs to be adjusted for the proper deposition rate. An accurate measurement was difficult to obtain. Therefore, a layer of Titanium will have to be put down before the Lead. Further test runs will be made tomorrow.
1999-6-23 Information
A cleanroom user requested that the MiRC staff set up the CVC E-beam Evaporator to deposit Lead. The metal was properly melted down to specifications. The IC5 controller was set up to run lead. We will be fine tuning the deposition tooling factor in the near future. The gears that rotate the carousel were also reported to be misaligned. The problem has been remedied.
1999-5-5 Reminder
Reminder: let the aluminum crucible cool completely before venting the chamber. Venting the chamber early causes the crucible to crack and split.
1999-5-26 Cooling Water
A cleanroom user reported a water interlock alarm. We replaced the water filter to increase water flow. Please remember to make sure that the crucibles are full of metal before using the e-beam.
1999-5-20 Crucible Pocket Alignment
Cleanroom user reported that the cruciable was misalligned. The Crucible was realigned and some aluminum was melted in the respected crucible. Test runs were made and the Evaporator is fully operational.
1999-5-19 Crucible Pocket Alignment
Cleanroom User reported that crucible pockets were misaligned. Realigned the crucible pockets and ran several test runs. System is now operational.
1999-5-17 Cryo Pump Regeneration
The system remains down while the cryogenic pump cools down. Any problems should be reported to the technical staff immediately.
1999-4-27 Crucible Pocket Alignment
Cleanroom user reported that the crucible pockets were misaligned. Realigned the crucible pockets, test runs were made and the machine is now operational.
1999-4-23 Deposition Controller
The aluminum crucible has been replaced after the original crucible exploded during a run. The crucible exploded because of overheating which had initially caused the crucible to crack in several places. The overheating occurred because a user had modified the material parameters in the IC5 deposition controller. Users are not permitted to modify any of the material parameters such as power levels and tooling factors. Users may only modify deposition rate and deposition thickness which are located in the Process Parameters section of the IC5.
1999-4-2 Electron Beam Power Supply
The system was experiencing "AIR/CAB" interlock problems. A replacement part was installed on Thursday. We have run several test runs without problems. Users: If the crucible metals are running low, please add more metal to the crucibles.
1999-4-14 Crucible Pocket Alignment
We realigned the e-beam evaporator crucibles. Please make sure the metals are full before performing your run. Please pay attention to the metal labels on the evaporator. We will be temporarily replacing the titanium with nickel.
1999-3-9 Crucible Pocket Alignment
We adjusted the alignment of the crucible pockets. We trained a user on the use of the equipment. We obtained satisfactory results.
1999-3-4 Substrate Holder
During the course of depositions, several layers of metal have been deposited on the circular ring that holds the square substrate holder. We sandblasted the circular holder and now all of the unnecessary layers have been removed.
1999-3-2 Test Run
We performed several test runs depositing Titanium and Chrome. We obtained satisfactory results.
1999-3-17 Electron Beam Power Supply
A user reported that the e-beam evaporator power supply high voltage would not come on. We determined that a loose metal flake was shorting out the filament electrodes.
1999-3-16 Crucible Pocket Alignment
We checked the crucible alignment on the e-beam evaporator. We are working on implementing a permanent solution to the repeated alignment problems we have been experiencing.
1999-3-15 Vacuum Pump
The Evaporator was temporarily down today. The oil in the mechanical pump was changed. The pump was flushed twice and then filled with new oil. The Evaporator is now fully fucntional and ready to use .
1999-3-12 Deposition Controller
A user was complaining yesterday evening that the Nickel metal was spraying out of the crucible during evaporation. To solve this problem, we increased both of the rise and soak times. We also increased the power in the process. Also, when you are evaporation Nickel, increase the amplitude of the beam during the initial rise and soak times. This will decrease the possibility of any sparks.
1999-3-11 Deposition Controller
A user complained that the nickel was spraying out of the crucible when he tried to evaporate it. We will be looking at the process and trying to find the cause of the problem tomorrow.
1999-3-1 Crucible Refilled
We added and melted gold metal in the respective crucible. We also continued to adjust tooling factors in the system.
1999-2-9 Information
Replaced nickel crucible with platinum.
1999-2-8 Information
The Platinum crucible will be permanently installed in the E-beam. The system was inspected and functions properly.
1999-2-5 Electron Beam Power Supply
The Hi Voltage on the power supply would not come on. We reset a switch and the system is functional.
1999-2-4 Test Run
We trained a user on the equipment. The test runs yielded satisfactory results.
1999-2-25 Crucible Refilled
We melted some more gold down. We are continuing to recalibrate the tooling factors for each of the materials. We also trained a new user.
1999-2-24 Calibration
We continued to adjust the tooling factors. The tooling factors for the Titanium are complete. We performed test runs using Chrome. We obtained satisfactory results. We also deposited Aluminum on substrate holders for the RIE.
1999-2-24 Crucible Refilled
More gold was added to the E-beam gold crucible. We recommend that all users make sure that the crucible is pretty full before evaporating. More gold will be added tomorrow.
1999-2-23 Deposition Controller
We are continuing to record some of the settings on the deposition monitor so that we will have a copy if they are lost. We are also continuing the process of adjusting all of the tooling factors to increase the accuracy of the deposition thicknesses. We trained a user on the equipment. Also, the crucible pockets were misaligned. We are in the process of a more permanent repair to this problem. In addition, a cleanroom user accidentally destroyed the gold crucible by not properly aligning the beam before starting the deposition. Always remember to reduce the amplitude to two or three bars and move the beam position to the center of the position display before pressing start on the deposition controller. Then watch the beam through the sight glass on the front of the chamber as the beam power is increasing and adjust the beam position and amplitude as necessary. If you see an extremely bright spot, that is usually an indication that the beam is hitting the crucible.
1999-2-22 Cryo Pump Regeneration
The e-beam cryo-pump was regenerated over the weekend. Hopefully this will increase the pumping speed. We also recorded some of the settings on the deposition monitor so that we will have a copy if they are lost. We are in the process of adjusting all of the tooling factors to increase the accuracy of the deposition thicknesses.
1999-2-19 Crucible Pocket Alignment
We completed the tooling adjustments for the Silver process. The sensor reads the accurate thickness deposited. The gears on the crucible alignment pockets were replaced.
1999-2-18 Information
The platinum crucible is in the drybox near the evaporator. If you need to use platinum, you may replace the silver in the e-beam with platinum and put the silver in the drybox. It is your responsibility to make sure that the correct metal is installed. We ran several silver processes and are continuing to adjust the tooling to the Silver program. The crucible pockets were misaligned. We adjusted the set screw to the gears. We will be replacing these gears tomorrow.
1999-2-16 Crucible Pocket Alignment
The crucible pocket was misaligned. We adjusted the gears for a smoother alignment of the crucibles. We performed test runs depositing Silver metal. Since this is the first time that Silver metal has been used in the E-beam, we discovered that we need to adjust the toolinng in order for the program controller to correctly display depositions. We will be making these adjustments tomorrow morning.
1999-2-15 Information
We used the multi-sample dome to deposit Aluminum on several 2" wafers for a class. The process yielded satisfactory results. We also replaced the crucible containing platinum with a new silver crucible. We performed several runs to melt down new silver in the crucible and set up the deposition controller for silver depositions.
1999-2-12 Test Run
We performed several test runs in order to obtain deposition rates for the multi-sample dome. We will be using the dome to deposit Aluminum for a class.
1999-2-11 Test Run
We ran several test runs checking the z-ratio of the sample holder dome. E-beam users: Please remember to enter each of your runs in the log book.
1999-2-10 Deposition Controller
The deposition controller locked up. We reset the controller.
1999-11-9 Information
The system is still down. We will notify users of the status tomorrow.
1999-11-5 Electron Beam Power Supply
Cleanroom user reported high voltage power fluctuating. We are currently working on resolving this problem.
1999-11-11 Information
Power supply for the E-beam will not be in until Monday. We will continue to update you on the progress with this machine.
1999-10-4 Crucible Pocket Alignment
A cleanroom user reported that the crucible carousel was not aligned. It was determined that the gears and coupling were stripped. Both items have been replaced. An improved solution is being sought. A cleanroom user reported that the ion gauge was not lighting. The filament had burned out. The tube has been replaced. Please do not turn off the deposition controller or the ion gauge controller after your run.
1999-10-28 Vacuum Poor
Cleanroom user reported that the system was having a high base pressure. Technical staff will be looking into the problem on Friday.
1999-1-8 Vacuum Poor
We have traced the leak to the roughing valve and are working on replacing the valve.
1999-1-7 Crucible Pocket Alignment
Realigned crucible pockets.
1999-1-7 Vacuum Poor
The system will only rough down to about 500 millitorr. The pump is okay, so there may be a leak somewhere. We did not have time today to investigate this further.
1999-1-6 Crucible Pocket Alignment
The crucible pockets were misaligned. They have since been realigned and the system is running properly.
1999-1-26 Crucible Pocket Alignment
Realigned crucible pockets. Gears has slipped. Reconfigured material list. If anyone changes a material, you are responsible from modifying the material list to indicate the change.
1999-1-21 Electron Beam Focus
The problem with the beam width has been solved. We had a problem with the vacuum and interlocks, but we resolved these problems.
1999-1-20 Electron Beam Focus
There is a problem with the width of the electron beam. We have adjusted the rods that control the beam aim and have reduced the width some. We will work on this problem more Thursday.
1999-1-19 Crucible Pocket Alignment
Adjusted crucible alignment. Tightened bevel gears to reduce slippage. Replaced set screw in one gear.
1999-1-14 Crucible Pocket Alignment
We realigned the crucible pockets. A user error caused an additional problem with the shutter. That situation has been rectified. A new shutter shaft was machined for the evaporator. It has since been installed, and the system is now operable.
1999-1-11 Vacuum Poor
The roughing valve has been rebuilt and replaced. The system base pressure is good now.